Project No.1 - Amina/001


First project - Amina-001
Building works



After markin place for building, we first clean field and excavate humus in lenght d=15 cm. Then we excavate ground wide for beasmant if there is in plan. After that we excavate canal for band fundation.


In living room we build chimeny for needs of fireplace and kitchen if that want Investor.



Mural elements are made in in workshop by project and deliver on site. Doors and window are implanted in wall elements. Entrance door must have backup lock, and other doors are with locksmit.
 

Outside working

Working with outside surface from isoterm whose are build from plastic. Garage doors are colored with final color for metal in two ways.

Roof elements

Roof construction are made from braced gider. Montage of gider are puted over walls and they are stabilated with metal elements. There are stabilated from each other with board lenght d=24 mm.





Celing construction

Celing construction are made from grill, isoaltion and celing bandage. Under that there is grill from board 48/40 mm, and over that there is vapor barrage from PVC foil and plaster carton.



Floors

In rooms, dining room, stairs and galerie set up aluminous floor d=7 mm. Parquet are puted over veneering from glue, than blanch and lacquer in three veneering.



Internal working

Celing are colored with basic color with earlier arrangement compounds with plaster carton and glet mass. In second variant Investor can color walls with his own choice.  Walls of bathroom are in tile home made.