Building works
After
markin place for building, we first clean field and excavate humus in lenght
d=15 cm. Then we excavate ground wide for beasmant if there is in plan. After
that we excavate canal for band fundation.
In
living room we build chimeny for needs of fireplace and kitchen if that want
Investor.
Mural
elements are made in in workshop by project and deliver on site. Doors and
window are implanted in wall elements. Entrance door must have backup lock, and
other doors are with locksmit.
Outside working
Working
with outside surface from isoterm whose are build from plastic. Garage doors
are colored with final color for metal in two ways.
Roof
construction are made from braced gider. Montage of gider are puted over walls and
they are stabilated with metal elements. There are stabilated from each other
with board lenght d=24 mm.
Celing construction
Celing
construction are made from grill, isoaltion and celing bandage. Under that
there is grill from board 48/40 mm, and over that there is vapor barrage from
PVC foil and plaster carton.
Floors
Internal working
Celing
are colored with basic color with earlier arrangement compounds with plaster
carton and glet mass. In second variant Investor can color walls with his own
choice. Walls of bathroom are in tile
home made.
0 comments: